Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont

Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont
Author :
Publisher :
Total Pages : 34
Release :
ISBN-10 : OCLC:45710279
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont by : Hartgen Archeological Associates, Inc

Download or read book Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont written by Hartgen Archeological Associates, Inc and published by . This book was released on 1998 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont Related Books

Phase I Archeological Field Investigations of Middle Road Over the Cold River Bridge Replacement, BRO 1443 (29), Town of Clarendon, Rutland County, Vermont
Language: en
Pages: 34
Archaeological Phase IB Survey and Phase II Testing of the Proposed Mendon BRO 1443(35), Bridge Replacement Project, Mendon, Rutland County, Vermont
Language: en
Pages: 49
Phase IB Archeological Reconnaissance Survey, Corinth Bridge No. 36 Replacement Project
Language: en
Pages: 19
Authors:
Categories: Archaeological surveying
Type: BOOK - Published: 2012 - Publisher:

DOWNLOAD EBOOK

"... proposed replacement of Bridge No. 36 on Chicken Farm Road over the Tabor Branch of the Waits River ..."--Page i.