Proposed 138 KV Transmission Line Between Jingle Pot Substation and Northfield Substation
Author | : B.C. Hydro. Transmission Engineering & Maintenance Department |
Publisher | : BC Hydro |
Total Pages | : 21 |
Release | : 1997-01-01 |
ISBN-10 | : 0772632855 |
ISBN-13 | : 9780772632852 |
Rating | : 4/5 (852 Downloads) |
Download or read book Proposed 138 KV Transmission Line Between Jingle Pot Substation and Northfield Substation written by B.C. Hydro. Transmission Engineering & Maintenance Department and published by BC Hydro. This book was released on 1997-01-01 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to identify and to provide the technical assessment of transmission alternatives that meet the short- and long-term electrical supply requirements of Northfield Substation in Nanaimo, British Columbia. The transmission proposals studied relate to substation modifications and to the installation of a new line along an existing right-of-way about 3 kilometres long between Northfield and Jingle Pot substations. The scope of alternatives considered includes line routing to minimize right-of-way clearing, structure configuration, conductor selection, and voltage. Technical assessment and comparison of these alternatives is based on cost, clearing, access, and right-of-way requirements.