The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain

The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:727333048
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain by :

Download or read book The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain written by and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A performance assessment is required to demonstrate compliance with the post-closure performance objectives for the Yucca Mountain Project (YMP), as stated in 10 CFR Part 63.1 13 (66 FR 55732, p. 55807). A performance assessment is defined in 10 CFR 63.2 (66 FR 55732, p. 55794) as an analysis that: (1) identifies the features, events, and processes (FEPs) that might affect the potential geologic repository; (2) examines the effects of those FEPs upon the performance of the potential geologic repository; and (3) estimates the expected dose incurred by a specified reasonably maximally exposed individual as a result of releases caused by significant FEPs. The performance assessment must also provide the technical basis for inclusion or exclusion of specific FEPs in the performance assessment as stated in 10 CFR 63.114 (66 FR 55732, p. 55807). An initial approach for FEP development, in support of the Total System Performance Assessment for the Site Recommendation (TSPA-SR) (CRWMS M & O 2000e), was documented in Freeze et al. (2001). The development of a comprehensive list of FEPs potentially relevant to the post-closure performance of the potential Yucca Mountain repository is an ongoing, iterative process based on site-specific information, design, and regulations. Although comprehensiveness of the FEPs list cannot be proven with absolute certainty, confidence can be gained through a combination of formal and systematic reviews (both top-down and bottom-up), audits, and comparisons with other FEP lists and through the application of more than one classification scheme. To support TSPA-SR, DOE used a multi-step approach for demonstrating comprehensiveness of the initial list of FEPs. Input was obtained from other international radioactive waste disposal programs as compiled by the Nuclear Energy Agency (NEA) of the Organization for Economic Co-operation and Development (OECD) to establish a general list of FEPs. The list was subsequently refined to include YMP-specific FEPs that account for the uniqueness of the design and setting (unsaturated fractured tuff). FEPs were then categorized to assess potential interactions and to establish the framework for scenario development and assessment. The level of detail of each individual FEP was determined to be the lowest level that would support model development activities. Although the level of detail between FEPs varies, the level of detail is considered appropriate to demonstrate the safety case.


The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain Related Books

The Enhanced Plan for Features, Events, and Processes (FEPS) at Yucca Mountain
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2002 - Publisher:

DOWNLOAD EBOOK

A performance assessment is required to demonstrate compliance with the post-closure performance objectives for the Yucca Mountain Project (YMP), as stated in 1
THE DEVELOPMENT OF THE YUCCA MOUNTAIN PROJECT FEATURE, EVENT, AND PROCESS (FEP) DATABASE.
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2000 - Publisher:

DOWNLOAD EBOOK

A Total System Performance Assessment for Site Recommendation (TSPA-SR) has recently been completed (CRWMS M & O, 2000b) for the potential high-level waste repo
Yucca Mountain Feature, Event, and Process (FEP) Analysis
Language: en
Pages: 2
Authors:
Categories:
Type: BOOK - Published: 2005 - Publisher:

DOWNLOAD EBOOK

A Total System Performance Assessment (TSPA) model was developed for the U.S. Department of Energy (DOE) Yucca Mountain Project (YMP) to help demonstrate compli
The Development of Information Catalogued in Rev 00 of the YMP FEP Database
Language: en
Pages: 5
Authors:
Categories:
Type: BOOK - Published: 2001 - Publisher:

DOWNLOAD EBOOK

Under the provisions of the U.S. Department of Energy (DOE) Interim Guidance, a performance assessment is required to demonstrate compliance with the postclosur